DVIDS – News – Photo Essay: Fort McCoy working with energy provider to improve electrical grid
Contractors complete electrical work Nov. 8, 2022, on South Post at Fort McCoy, Wis.
Fort McCoy and Xcel Energy are in the process of changing the electrical grid on post from a Delta Electrical System to a Wye Electrical System, Fort McCoy Directorate of Public Works officials said.
Wye is a three-phase electrical system that uses a wire for each electrical leg and a separate neutral wire.
Delta is also a three-phase, but uses one of the legs as the neutral so it only has three wires.
Work will be ongoing.
Fort McCoy was established in 1909 and its motto is to be the “Total Force Training Center.” Located in the heart of the upper Midwest, Fort McCoy is the only U.S. Army installation in Wisconsin.
The installation has provided support and facilities for the field and classroom training of more than 100,000 military personnel from all services nearly every year since 1984.
Learn more about Fort McCoy online at https://home.army.mil/mccoy, on the Defense Visual Information Distribution System at https://www.dvidshub.net/fmpao, on Facebook by searching “ftmccoy,” and on Twitter by searching “usagmccoy.”
Also try downloading the Digital Garrison app to your smartphone and set “Fort McCoy” or another installation as your preferred base.
Date Taken: | 11.15.2022 |
Date Posted: | 11.15.2022 22:02 |
Story ID: | 433333 |
Location: | FORT MCCOY, WI, US |
Web Views: | 2 |
Downloads: | 0 |
PUBLIC DOMAIN
This work, Photo Essay: Fort McCoy working with energy provider to improve electrical grid, by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.